Our New Facility:
Construction Slideshow
Move
July 27, 2009 Slab is poured
July 27, 2009 Steel framework begins to rise
July 28, 2009 Steel Framework
July 28, 2009 Steel Framework
July 28, 2009
July 29, 2009
August 1, 2009
August 5, 2009 Inside the Steel Framework
August 7, 2009
August 17, 2008
August 17, 2008
August 19, 2008
August 19, 2008
August 20, 2008
August 24, 2008
August 28, 2008
September 8, 2009
September 9, 2009
September 9, 2009
Our General Contractor (Bruce Thomas -right) and one of his brickmasons.
September 14, 2009
September 15, 2009
Steeple Dedication Day
Steeple Dedication Day
Steeple Dedication Day The Cross is ready for placement.
Steeple Dedication Day Pastor (left) and General Contractor (right) ascend in lift.
Steeple Dedication Day Church members gather.
Steeple Dedication Day On the way up.
Steeple Dedication Day View from the lift.
Steeple Dedication Day Near the top.
Steeple Dedication Day View from the steeple.
Steeple Dedication Day Placing the Cross.
September 21, 2009 Steeple at Dawn
September 21, 2009 Youth Ministry Area begins to take shape.
September 21, 2009 Fellowship Hall entrance to Kitchen.
September 21, 2009 Exterior view of covered-drive entrance.
October 10, 2009 Exterior view from Old Highway 74
October 10, 2009 Fellowship Hall
October 9, 2009 Front and Main Entrance
October 9, 2009 View Looking In Main Entrance
October 19, 2009 Site of Future Cafe
October 19, 2009 Preschool Area Exterior Doors
Inside a Future Preschool Classroom
The Pulpit Area Begins to Take Shape
Looking Toward Sanctuary Front
Brick Masons Place Cross at Front of Church
Future Preschool Entrance
Exterior Doors of Preschool Classrooms
Installation of Arch and Columns Proceeds at Front of Church
View in Kitchen Looking to Serving Window
View of Main Greeting Area from Future Cafe
Looking into the balcony from the sanctuary floor.
Sanctuary Pulipt Area
Future Youth Lounge.
Fellowship Hall
Front view.
Preschool and Drive-through Entrance
View of Pulpit Area from Sanctuary Balcony
View of Balcony from Sanctuary Floor
Fellowship Hall
View of Church from Intersection of Old Highway 74 and Old Pageland-Marshville Road
Looking into the future greeting space and cafe'.
Kitchen equipment is delivered.
Preschool and Drive-up Entrance
Stage area in Fellowship Hall
Main Entrance
Greeting area viewed from the cafe'.
Sanctuary view from Balcony
